Tuesday, June 9, 2015

The tail

I basically just started at the beginning of the manual.
The first thing to take care of was the horizontal stabilizer and elevator.
Step one was reaming and installing the elevator hinge bushings which for some reason I do not have photos.  Then I had to measure and mark out positions for the ribs and then Hysol them in place.

That is one of my reamers which had to be grinded to fit in a socket so that I was able
to turn it with a wrench.














No comments:

Post a Comment